Here is a list of the most recent projects North East Construction Services have worked on to date. Please contact us if you have any specific questions about any project listed.
Dampier Port Authority
October 2011
Client: Dampier Port Authority
Project: DPA Lower Laydown office Complex
Scope: Construct and install 4 x floor office and verandahs including concrete works ( To Category 5 Rating)
Citic Pacific Mining/Cimeco
November 2011
Client: Citic Pacific Mining/Cimeco
Project: Control room and Sample Building works
Scope: Upgrades to buildings and finish off works, Fencing and A/C works
Portacomm/ BHP Billiton
November /December 2011
Client: Portacomm/ BHP Billiton
Project: Jigalong workshop
Scope: Install and fit out of two storey office block
Dampier Port Authority
January 2012
Client: Dampier Port Authority
Project: DPA second office complex
Scope: Construction of 6 x floor office and toilet block including concrete and verandahs (Installation Started)
Doric Group BHP Billiton Warawandoo Camp Jimblebar
April 2012
Client: Doric Group
Project: Warawandoo Temp camp and extension to existing camp.
Scope: Installation of 420 x Accomodation rooms and 2 x Laundries including Verandahs.expected completion October 2012.
Cimeco/ Forge Group Main Crusher 2 and 4 cladding installation
October 2012
Client: Cimeco/ Forge Group
Project: Cladding installation to crusher 2 and 4
Scope: Install cladding to 4th floor compressor areas on main crusher 2 and 4 at the main pit in Sino iron mine site. Expected completion December 2012.
Calibre / Rio Tinto Concrete works 8 Mile Karratha
January 2013
Client: Precision Plumbing
Project: Concrete works various
Scope : Form and pour approx 400m3 of concrete for light pole footings, compressor slabs, ring beams for tanks, access paths and plinths to accomodate new fire suppression system. Expected completetion March 2013.
Pindan/ Rio Tinto Building installation Cape Lambert WA
March 2013
Client: Pindan Contracting
Project: Substation Installation
Scope: Install single and double floor substaions at various locations on the Cape Lambert port B site for the new stacker and reclaimer installation.Buildings are approx 70 Tonne per floor.Expected completion June 2013
Portaccomm/ Rio Tinto Fuel Hubs Brockman/ West Angleles WA
June 2013 (Ongoing)
Client: Portaccomm/ Keller Group
Project: Installation of Offices for Fuel hubs.
Scope: Installation of 1 x 18 x 12 office 1 x 12 x 3 Crib and 1 x 12 x 3 Ablution including associated verandahs and pathways at two seperate sites. Expected completion August 2013.