Projects

Here is a list of the most recent projects North East Construction Services have worked on to date. Please contact us if you have any specific questions about any project listed.

Dampier Port Authority

October 2011
Client: Dampier Port Authority
Project: DPA Lower Laydown office Complex
Scope: Construct and install 4 x floor office and verandahs including concrete works ( To Category 5 Rating)

Citic Pacific Mining/Cimeco

November 2011

Client: Citic Pacific Mining/Cimeco
Project: Control room and Sample Building works
Scope: Upgrades to buildings and finish off works, Fencing and A/C works

Portacomm/ BHP Billiton

November /December 2011

Client: Portacomm/ BHP Billiton
Project: Jigalong workshop
Scope: Install and fit out of two storey office block

Dampier Port Authority

January 2012

Client: Dampier Port Authority
Project: DPA second office complex
Scope: Construction of 6 x floor office and toilet block including concrete and verandahs (Installation Started)

Doric Group BHP Billiton Warawandoo Camp Jimblebar

April 2012

Client: Doric Group
Project: Warawandoo Temp camp and extension to existing camp.

Scope: Installation of 420 x Accomodation rooms and 2 x Laundries including Verandahs.expected completion October 2012.

Cimeco/ Forge Group Main Crusher 2 and 4 cladding installation 

October 2012

Client: Cimeco/ Forge Group

Project: Cladding installation to crusher 2 and 4

Scope: Install cladding to 4th floor compressor areas on main crusher 2 and 4 at the main pit in Sino iron mine site. Expected completion December 2012.

Calibre / Rio Tinto Concrete works 8 Mile Karratha

January 2013

Client: Precision Plumbing

Project: Concrete works various

Scope : Form and pour approx 400m3 of concrete for light pole footings, compressor slabs, ring beams for tanks, access paths and plinths to accomodate new fire suppression system. Expected completetion March 2013.

Pindan/ Rio Tinto Building installation Cape Lambert WA

March 2013

Client: Pindan Contracting

Project: Substation Installation

Scope: Install single and double floor substaions at various locations on the Cape Lambert port B site for the new stacker and reclaimer installation.Buildings are approx 70 Tonne per floor.Expected completion June 2013

Portaccomm/ Rio Tinto Fuel Hubs Brockman/ West Angleles WA

June 2013 (Ongoing)

Client: Portaccomm/ Keller Group

Project: Installation of Offices for Fuel hubs.

Scope: Installation of 1 x 18 x 12 office 1 x 12 x 3 Crib and 1 x 12 x 3 Ablution including associated verandahs and pathways at two seperate sites. Expected completion August 2013.